Mark 4 Correlator Memo Series
Mark 4 Correlator
Note: The MIT Haystack Observatory Mark 4 correlator has been replaced with a new software correlator running DiFX.
The Mark 4 correlator was capable of simultaneously processing 1024Mbps data streams from up to 16 stations, performing cross-correlations on all 120 baselines. For continuum processing, 32 lags were normally processed, but the 131,000 lags available in the correlator could be flexibly reconfigured to trade number of baselines with number of lags. The original design of the correlator was targeted for the use with the tape-based Mark 4 VLBI data system, but was eventually updated to support the disk-based Mark 5 VLBI data system as well. In addition, the correlator supported real-time correlation of data transmitted electronically from stations (so-called ‘e-VLBI’), and had been used in this mode with data transmitted in real-time at up to 512Mbps from stations distributed globally.
The Mark 4 correlator was developed by the International Advanced Correlator Consortium (IACC), which divided development responsibilities between the U.S. and Europe, in a project which started in 1993 and concluded in late 1999. MIT Haystack Observatory developed the signal-processing core of the correlator, including a large ASIC chip specifically designed for high-speed VLBI processing. The Joint Institute for VLBI in Europe (JIVE), along with the Jodrell Bank Observatory, developed the ‘Station Unit’, which is responsible for reconstituting data from tape and pre-applying a model delay before transmission to the correlator core.
Mark 4 VLBI correlators formerly existed at MIT Haystack Observatory, the U.S. Naval Observatory in Washington, D.C., JIVE in The Netherlands, and at the Max Planck Institute for Radio Astronomy in Bonn, Germany. In addition, large connected-element correlators based on the Mark 4 correlator ASIC chip and board were in place at the Sub-Millimeter Array (SMA) at Mauna Kea, Hawaii, and at Westerbord, The Netherlands.
Mark 4 Correlator Memos
Memo | Title | Author | Date |
---|---|---|---|
001 | Proposal for a Cost Effective Doubling of Existing VLBI Sensitivity | A.R. Whitney | 19900518 |
002 | East Coast VLBI Group The Mark IV VLBI System – the Next Step | A.R. Whitney | 19901023 |
003 | Preliminary Mark IV Formatter Specification | A.R. Whitney | 19901101 |
004 | Comparison of OS-9 and VxWorks — | 19900829 | |
005 | Another Consideration for Mark IV | D.B. Shaffer | 19910106 |
006 | Mark IV Formatter Spec. – Draft 2 | A.R. Whitney | 19910108 |
007 | Limitations in recording high frequencies with the VLBA record electronics | A.E.E. Rogers | 19910306 |
008 | TAXI Fleet for MKIV and V | H.F. Hinteregger | 19910314 |
009 | ACL for Write Driver | H.F. Hinteregger | 19910401 |
010 | A magnetic circuit model for the VLBA headstack | A.E.E. Rogers | 19890605 |
011 | Wavelength Dependence of D1 and MET VLBA “Headcurves” | A.E.E.Rogers | 19891227 |
012 | Tape Noise Measurements of D1K & S-VHS | A.E.E. Rogers | 19900109 |
013 | A Quick Test of 8mm Evaporated Metal Tape (MET) | A.E.E. Rogers | 19900130 |
014 | Tests of Parallel Playback Electronics | A.E.E. Rogers, E.F. Nesman | 19900202 |
015 | Measurements of record spacing loss and numerical model to evaluate the effect of | A.E.E. Rogers, S. Deligeorges | 19900627 |
016 | Tests of a method to support thick and thin tape on a processor transport | A.E.E. Rogers, S. Deligeorges | 19900627 |
017 | Tests of the VLBA Read/Write Interface | A.E.E. Rogers, H.F. Hinteregger | 19900717 |
018 | Record Cross-talk Theory | A.E.E. Rogers, D.L. Smythe | 19900717 |
019 | Some Tests of the TI TL592B Amplifier | A.E.E. Rogers, S. Deligeorges, J. Hargreaves | 19900813 |
020 | Dummy Headstack Post for Improved Tracking Symmetry | A.E.E. Rogers, H.F. Hinteregger, P. Bolis | 19900906 |
021 | Preliminary report on First VLBA Tapes | A.E.E. Rogers, H.F. Hinteregger, D.L. Smythe, P.Bolis | 19901004 |
022 | Thin Tape Facts | H.F. Hinteregger | 19901019 |
023 | Tape winding and tape thickness non- uniformity | A.E.E. Rogers | 19901130 |
024 | Update on the AMPEX/MAXELL tape packing problem | A.E.E. Rogers | 19901204 |
025 | Edge slitting signatures and edge quality of 16 mm tapes | A.E.E. Rogers | 19901204 |
026 | Dynamic forces on the tape edge | A.E.E. Rogers | 19901231 |
027 | Tape Elastic Constant Check via Tape Winding | A.E.E. Rogers, H.F. Hinteregger | 19910119 |
028 | Methods of Measuring Headstack Gap Length | A.E.E. Rogers, H.F. Hinteregger | 19910118 |
029 | Revised Model for VLBA Head Efficiency | A.E.E. Rogers | 19910131 |
030 | Capacitance of Gapped Bars | D.L. Smythe | 19910214 |
031 | Efficiency variations in VLBA headstacks | A.E.E. Rogers | 19910225 |
032 | Scanning Electron Microscope (SEM) Gap Length Measurement | H.F. Hinteregger | 19910227 |
033 | How Head SNR Affects Reproduce Performance | D.L. Smythe | 19910517 |
034 | Calculations concerning air entrapment at the headstack and the maintenance of good head-to-tape contact | A.E.E. Rogers | 19910612 |
035 | Tape profile along the headstack | A.E.E. Rogers | 19910610 |
036 | Dynamic Friction and Viscous Drag in the Vacuum Columns | A.E.E. Rogers | 19910617 |
037 | Write Driver Asymmetry Improvements | V.A. Tran, A.E.E. Rogers | 19910711 |
038 | Head to tape contact at 320 IPS with thin tape | D.L. Smythe | 19910617 |
039 | Performance of Mark IIIA Recorder at 56 kbpi | D.L. Smythe | 19910618 |
040 | Vacuum Column Air Bearing Clearance | A.E.E.Rogers | 19910627 |
041 | Tape Winding Dynamics | A.E.E.Rogers | 19910708 |
042 | Theoretical Model for Head Flying | A.E.E.Rogers | 19910702 |
043 | Simple method of measuring edge curl | A.E.E.Rogers | 19910710 |
044 | Thermal Calculations for High Tape Speeds | A.E.E. Rogers | 19910715 |
045 | Slipping Capstans | A.E.E. Rogers | 19910715 |
046 | Accelerated tape wear tests | A.E.E. Rogers | 19910717 |
047 | VLBA Write Driver at 18 Mb/s | D.L. Smythe | 19910712 |
048 | Method of contouring heads for high tape speeds | A.E.E. Rogers | 19910731 |
049 | Spacing loss from uneven wear of headstacks | A.E.E. Rogers, H.F. Hinteregger | 19910802 |
050 | Magnetic Tape “Flying” Measurements vs Model | A.E.E. Rogers, J. Starr | 19910823 |
051 | Preliminary tests of various low friction Surfaces | A.E.E. Rogers | 19910808 |
052 | Quality Control Checks for Inch-Worm Drivers | D.L. Smythe | 19910821 |
053 | Modifying the VLBA Head Interface for Recording at 18 Mbs | D.L. Smythe | 19910822 |
054 | Reel Alignment Tolerance | A.E.E. Rogers | 19911021 |
055 | Reels for thin tape | H.F. Hinteregger, A.E.E. Rogers | 19911023 |
056 | Possible variations on the vacuum loop | A.E.E. Rogers | 19910830 |
057 | Additions to head flying model and comparison with measurements | A.E.E. Rogers | 19910917 |
058 | Preliminary tests of new and experimental Headstacks | A.E.E. Rogers | 19910925 |
059 | Write Drive Improvements | D.L. Smythe | 19911004 |
060 | Head wear rates with Fotoceram spacers | A.E.E. Rogers | 19911021 |
061 | Progress report on the solution to the tape edges heating problem | H.F. Hinteregger, A.E.E. Rogers | 19911022 |
062 | Mark 4 Drawings | R. Cady, E. Nesman | 19911126 |
063 | Tape (thin) and transport handling procedures | H.F. Hinteregger, A.E.E. Rogers | 19910927 |
064 | Configuration of Tape Path for Thin Tape and High Speed | H.F. Hinteregger, A.E.E. Rogers | 19920212 |
065 | Bar-code Reader on VLBA Transport | A.R. Whitney | 19911129 |
066 | The Effect of the Reel Hub on Tape Pack | H.F. Hinteregger, A.E.E. Rogers | 19911212 |
067 | Plan for accelerated testing of thin tape | A.E.E. Rogers | 19920202 |
068 | Tape Procurement Specification | A.E.E. Rogers, H.F. Hinteregger | 19920303 |
069 | Measured Tolerance on reel table alignment | A.E.E. Rogers, H.F. Hinteregger | 19920305 |
070 | Mechanical Upgrade Steps | A.E.E. Rogers, K.M.Wilson, H.F. Hinteregger | 19920305 |
071 | Mark 4 Head-Numbering Conventions | A.R. Whitney | 19920414 |
072 | Changes to MkIII Video Converter to Extend Bandwidth to 16 MHz | A.E.E. Rogers | 19920505 |
073 | Septum Interference with Precision Plate | K.M. Wilson | 19920205 |
074 | Summary of Results of Thin Tape Inspections | A.Sandler, H.Hinteregger, A.Rogers, N.Donald, D. Sousa | 19920218 |
075 | Mechanical Model for Reel Table Alignment Needed for Low Speed Running | A.E.E. Rogers | 19920312 |
076 | Head Assembly Mounting Screws Bottoming Out of the High Performance Damper | D. Fields | 19920310 |
077 | Head Flying: Expected Changes with Head Wear | A.E.E. Rogers | 19920430 |
078 | Differences in the VLBA, MkIII, & MkIV IF to Baseband Converter | A.E.E. Rogers | 19920505 |
079 | Tolerance of Tape Clearance in Vacuum Column | A.E.E. Rogers | 19920507 |
080 | Tape Edge Abrasion by Contact with Reel Flange Rims | A.E.E. Rogers | 19920519 |
081 | 4-Level sampling threshold sensitivity with the Bos chip | A.E.E. Rogers | 19920612 |
082 | Some Loss Factors | A.E.E. Rogers | 19920615 |
083 | Pass Locations | D.L. Smythe | 19920618 |
084 | Channel Track Assignments | D.L. Smythe, A.R. Whitney | 19920623 |
085 | More on the abrasion of tape edges by reel flanges | A.E.E. Rogers | 19920527 |
086 | Preliminary Tape Canister Drop Tests | A.E.E. Rogers, H.F. Hinteregger | 19920601 |
087 | Some Calculations of forces experienced by tapes during shipment | A.E.E. Rogers, H.F. Hinteregger | 19920601 |
088 | Version 6 of RECON | R.J. Cappallo | 19920615 |
089 | Elastic modulus measurements for thin tapes | D.Callahan, A.E.E. Rogers | 19920618 |
090 | Interim Report on Correlator Chip Study for Mark IV Correlator | A.R. Whitney | 19920623 |
091 | Correlator Chip Internal Data Paths | J.I. Levine | 19920619 |
092 | ASIC Pricing | W. Aldrich | 19920625 |
093 | ASIC Pricing (Again) | W. Aldrich | 19920616 |
094 | Tape loop clearance tolerance | A.E.E. Rogers | 19920623 |
095 | Tape winding and stretched tape | A.E.E. Rogers | 19920625 |
096 | Wear tests on short tapes | A.E.E. Rogers | 19920630 |
097 | Factors which influence the tape wind test | A.E.E. Rogers | 19920701 |
098 | The effect of debris on tape packing | A.E.E. Rogers | 19920702 |
099 | Accelerated thin tape tests: Status Report | A.E.E. Rogers | 19920706 |
100 | Upgrade to Mark IV Data-Acquisition Capability | D. Smythe | 19921013 |
101 | Addition of acceleration to Mark IV on-chip phase-rotor | A.R. Whitney | 19921027 |
102 | Correlator software documentation | C.J. Lonsdale | 19921028 |
103 | Reproduce at 18 Mb/s – Preliminary Results | D.L. Smythe | 19921104 |
104 | Delay/phase tracking in the MKIV Correlator | A.R. Whitney | 19921105 |
105 | A simple method to measure friction in vacuum columns | A.E.E. Rogers | 19920721 |
106 | Elastic modulus in the radial direction for the tape | D. Callahan, A.E.E. Rogers | 19920713 |
107 | Edge guiding force variation with vacuum door clearance | A.E.E. Rogers | 19920723 |
108 | A physical model for the effect of relative humidity on edge | A.E.E. Rogers | 19920728 |
109 | Humidity tests of the tape canister | D. Callahan, A.E.E. Rogers | 19920804 |
110 | Capstan & Idler Alignment Tests | A.E.E. Rogers, K. Wilson | 19920803 |
111 | Cost estimate for thin tape upgrade | A.E.E. Rogers, H.F. Hinteregger, M.W. McDonough | 19920804 |
112 | Magnetic tape surface resistivity variation with relative humidity | D. Callahan, A.E.E. Rogers | 19920805 |
113 | Thin Tape Upgrade – Changes/Additions to VLBA Acquisition Memo #290 | A.E.E. Rogers, H.F. Hinteregger | 19920805 |
114 | Influence of axis misalignment on edge guiding force | A.E.E. Rogers | 19920807 |
115 | Types of deposit and their dependence on humidity | A.E.E. Rogers | 19920826 |
116 | 16 Passes with a 2 mm Guard Band | D.L. Smythe | 19920821 |
117 | Record Spacing Loss Measurement for D1 Tape | A.E.E. Rogers | 19920923 |
118 | Accelerated thin tape tests:Status report update | A.E.E. Rogers | 19920929 |
119 | Failure of Ampex tape under low humidity conditions | A.E.E. Rogers, H.F. Hinteregger | 19921014 |
120 | Theoretical wear profiles for headstacks with soft spacers | A.E.E. Rogers, H.F. Hinteregger | 19921007 |
121 | Mark 4 Station Unit — Preliminary Specification | R. Cappallo, A.R. Whitney | 19921027 |
122 | Lag-dependent phase corrections | A.E.E. Rogers | 19921116 |
123 | Implementation of Delay/phase tracking in MKIV Correlator | A.R. Whitney | 19921120 |
124 | NFRA-ITR 199 on Correlator Architectures (NFRA ITR 199) | A. Bos | 19921001 |
125 | Notes on the Dual 2*2 Chip Layout | J.I. Levine | 19921201 |
126 | Preliminary Evaluation of a Gigabit-Rate Chip set for Data Communication (G-Link) | D.L. Smythe | 19921202 |
127 | Validity Bits and Data Normalization | B. Anderson | 19921211 |
128 | Three correlation schemes with X and Y validity | A.E.E. Rogers | 19930105 |
129 | Summary of proposed SMA correlator architecture | J.I. Levine, A.R. Whitney | 19930106 |
130 | Robust and Marginal Tapes:The Shape-of-Edge Difference, Extreme Wind and Shuttle Tests, High Tg Ampex Samples Looking good | H.F. Hinteregger | 19930108 |
131 | Update of Self-Packing Reel Specifications | H.F. Hinteregger | 19921207 |
132 | Further improvement of write driver performance | V.A. Tran, K.M. Wilson | 19921231 |
133 | Digital tone extractor normalization | A.E.E. Rogers | 19930108 |
134 | Haystack Head Stacks at 18 Mb/s | D.L. Smythe | 19930111 |
135 | Using a Single Squash Plate for Mark IV Tape Drives | D.L. Smythe | 19930111 |
136 | Vernier-Delay Control for Multiplexed Data in Correlator Array | A.R. Whitney | 19930216 |
137 | The Mark IV Tape Format – Revision 1.0 | A.R. Whitney | 19930217 |
138 | Expected correlation between sign and magnitude bits | A.E.E. Rogers | 19930223 |
139 | Redesigned 32-MHz synthesizer | A.E.E. Rogers | 19930301 |
140 | The EVN/Mark IV Station Unit Requirements | B. Anderson | 19930224 |
141 | The EVN/Mark IV Station Unit: Straw-Man Design | B. Anderson | 19930302 |
142 | Numerical Coding | W. Aldrich | 19930303 |
143 | Current state of postprocessing and archive subsystem software under UNIX | C. Lonsdale | 19930308 |
144 | Headstack Specification for MK3A/VLBA/- MK4 Compat | H.F. Hinteregger | 19930311 |
144.1 | Stepped and triple-cap headstack specification for VLBI tape recorder | H.F. Hinteregger | 19980720 |
144.2 | Stepped and triple-cap headstack specification for VLBI tape recorder | H.F. Hinteregger | 19980817 |
144.3 | Stepped and triple-cap headstack specification for VLBI tape recorder | H.F. Hinteregger | 20000303 |
145 | Thin Tape Upgrade – Summary of Parts, Dwgs, Assy & Test | A.E.E. Rogers, K.M. Wilson, H.F. Hinteregger, G. Peck | 19930127 |
146 | Version 7 of RECON | R.J. Cappallo | 19930127 |
147 | Suggested BBC Oscillator Improvements | A.E.E. Rogers | 19930330 |
148 | Normalization for Mark IV with Mark III Correlator | A.E.E. Rogers | 19930319 |
149 | Correlator Chip Design Review | W.Aldrich | 19930331 |
150 | MKIII BBC AGC options for 2-bit data | A.E.E. Rogers | 19930427 |
151 | Summary of 25 May 1993 Mark IV Meeting | A.R. Whitney | 19930526 |
152* | Summary of 27 April 1993 Mark IV Meeting | A.R. Whitney | 19930429 |
153 | The Fabrication of a High Speed Cross Point Switch | J. Goodman | 19930602 |
154 | Summary of 1 June 1993 Software Group Meeting | A.R. Whitney | 19930603 |
155 | Summary of 8 June 1993 Mark IV Meeting | A.R. Whitney | 19930609 |
156 | Performance maintenance and head wear | H.F. Hinteregger | 19930804 |
157 | Methods for further reduction in head flying and Head Wear | A.E.E. Rogers | 19930524 |
158 | Tape Packing at Low Tensions | A.E.E. Rogers, C. Lam | 19930726 |
159 | Simple method of checking reel motor torque | A.E.E. Rogers | 19930802 |
Revision | 19930809 | ||
160 | Reel servo stability margin | A.E.E. Rogers | 19930802 |
161 | An evaluation of the Jodrell bank headstacks | A.E.E. Rogers, P.G. Bolis, H.F. Hinteregger | 19930802 |
162 | Preliminary tests of modified “triple cap” contour | A.E.E. Rogers | 19930812 |
163 | Wear rates, head flying and performance of the current head design at various operating tensions | C. Lam | 19930901 |
164 | Wear rates for heads fotoceram and MN130 spacer materials | A.E.E. Rogers | 19930907 |
165 | Summary of Mark IV-related meetings – week of 7 September 1993 | A.R. Whitney | 19930910 |
166 | Test procedure for R131 Read Modules and R132 Parallel Reproduce Modules | D.L. Smythe, P.G. Bolis | 19930916 |
167 | Reel Servo/Driver Configuration and Margin Analysis Recommendations for More Reliable Operation at 320 ips Maximum | H.F. Hinteregger | 19930924 |
168 | A-file format and related issues | C.J. Lonsdale | 19930914 |
169 | Transmission Line Simulator Tests | J.I. Levine | 19931022 |
170 | MKIV Root File Formats | C.J. Lonsdale | 19931022 |
171 | MK4 Formatter FPGA Configuration Control | J.I. Levine | 19931022 |
172 | Mark4/EVN Data Distribution Network Simulation | J.I. Levine | 19931022 |
173 | Linkdata program and AFIO library changes | C.J. Lonsdale | 19931022 |
174* | Hardware Interface Specification Correlator Input Board to Backplane | D.L. Smythe, A. Bos | 19931005 |
174.2* | REVISED (REPLACES MK4 MEMO #195) | 19940321 | |
175 | System Data Interface Specification | 19940407 | |
176 | Proposed phase cal extractor for upgraded formatter A/D board | A.E.E. Rogers | 19910328 |
177 | Proposed redesign of the formatter A/D buffer module | A.E.E. Rogers, E.F. Nesman | 19930401 |
178 | Notes of Mark IV Station-Unit Phase-Calibration Tone Extraction | A.R. Whitney, R.J. Cappallo, E.F. Nesman | 19931027 |
179 | Detailed format of Mark III and Mark IV track- frame header | A.R. Whitney | 19931027 |
180 | PLL Clock Driver Timing | J.I. Goodman, J.I. Levine | 19931103 |
181 | Correlator-Board Backplane-Interface Signal Requirements | W.H. Aldrich, J.I. Goodman | 19931105 |
182 | The EVNFRA Correlator: Design Considerations | A. Bos | 19931001 |
183 | DZB and EVN Correlator Data Distribution Study NFRA Note 612 | R.P. Millenaar | 19930315 |
184 | Header Data Format | W.A. Aldrich | 19931123 |
185 | Revised Head Block Design | H.F. Hinteregger, A.E.E. Rogers, D.L. Smythe | 19931123 |
186 | Contours of “Triple-cap”-Heads | A.E.E. Rogers | 19931020 |
187 | Model for recorder tracking response to capstan and idler surface irregularities | A.E.E. Rogers | 19931123 |
188 | Increasing the band-width of the Mark IV preamplifier to MHz | D.L. Smythe | 19931124 |
189 | Upgrades to video converters for 16 MHz bandwidth | A.E.E. Rogers | 19940111 |
189.1 | Revision 1 | 19940610 | |
190 | Clock Signal from SMA Data Receivers | J.I. Levine | 19931122 |
191 | Correlator Board Hardware Specification | J.I. Goodman | 19931229 |
192 | Summary of VLSI chip-simulation Meeting | A.R. Whitney | 19940112 |
193 | Correlator Board Software Development | J.I. Goodman | 19940208 |
194 | System-level diagrams for the weak-minded | A.R. Whitney | 19940211 |
195 | Hardware Interface Specification Correlator Input Board to Backplane | D.L. Smythe | 19940214 |
174.2* | ***REPLACED BY REVISED MK4 MEMO #174.2, | 19940321 | |
196 | PBU Interface to the SU and the CCC | R.J. Cappallo | 19940214 |
197 | Distributing data without a Data Distributor | D.L. Smythe | 19940120 |
198 | Serial Link Interface Specification | D.L. Smythe | 19941215 |
199 | New A-file format | C.J. Lonsdale | 19940217 |
200 | PBU to SU Hardware Interface Specification | D.L. Smythe | 19940224 |
201 | New Timing Requirements for DATA to the Correlator Board | D.L. Smythe, J.I. Goodman | 19940321 |
202 | Some of the results of the “post-mortem” performed on Headstack E80 | P. Bolis | 19940401 |
203 | Recovery of Shock-Deformed Tape | H.F. Hinteregger, D.L. Smythe | 19940314 |
204 | Crosspoint Switch Functional Tests | J.I. Levine | 19940603 |
205* | Mark IV Tape Format, Recording Modes & Compatibility | A.R. Whitney | 19940712 |
205.2* | *205.2-6 has been superceded by Mark IV Memo #230 | 19941219 | |
205.3* | 19950306 | ||
205.4* | 19950324 | ||
205.5* | 19950404 | ||
205.6* | 19950604 | ||
206 | Correlator Back Plane Switching #81 Submillimeter Array Technical Memorandum | A. Dowd | 19940812 |
207 | Crate Controller to Correlator Board Software Interface | J. Goodman | 19940818 |
207.1 | 19950728 | ||
208 | Software Development Tasks for the HP 742 crate controller | N. Sitkoff, J. Goodman | 19940824 |
209 | Timing of Clock, Data, BOCF, and Control Signals at Correlator Backplane Pins | J. Goodman | 19940914 |
209.1 | 19941212 | ||
210 | Measurements of Recorder Head Profiles and Changes in the Profile with Tape Speed | S. Gross, A.E.E. Rogers, H.F. Hinteregger | 19940928 |
211 | Strategies in searching for “TOT” | R.J. Cappallo | 19941107 |
212 | The `Haystack’ 66×64 Crossbar Switch | J. Goodman | 19950131 |
213 | Much Better than Expected Thin-film MR Head Performance Observed | H.F. Hinteregger | 19950325 |
214 | Correlator Board Data and Configuration Management | A.R. Whitney | 19950222 |
215 | Modelling and Evaluation of the Current Headstack | S. Müftü | 19950510 |
216 | The Effect of Air Flow and Tension on the Exit Side Behavior of a Flat Contoured Recording Head | S. Müftü | 19950509 |
217 | Meeting with Navell | A.R. Whitney | 19950526 |
218 | Meeting with Corwil | A.R. Whitney | 19950530 |
219 | Adding Application Specific Software Routines To Core DSP Software | J. Goodman | 19950602 |
219.1 | 19950728 | ||
219.2 | 19960501 | ||
220 | Correlator Chip Pipeline Defect | W. Aldrich | 19950426 |
221 | Derivation of Linear and Quadratic Fits to an Input Spline Polynomial | R. Cappallo | 19940328 |
222 | Station Unit Spline Polynomial Evaluation | R. Cappallo | 19941102 |
223 | SYSTICK Generator | D.L. Smythe | 19950824 |
224 | System Sync Generator | D.L. Smythe | 19950914 |
225 | CMOS Correlator Preliminary Revision 0.03 | J. Canaris, W. Aldrich | 19931214 |
226 | The Haystack VLSI Correlator Chip Preliminary | W. Aldrich, A.R. Whitney | 19930610 |
227 | Input Board Functional Description Preliminary | W. Aldrich | 19950901 |
227.1 | 19951201 | ||
228 | Final Report – Evaluation of TF/MR Head with Advanced Tape | H.F. Hinteregger | 19950601 |
229 | Contact Tape Recording with a Flat Head Contour | H.F. Hinteregger | 19951208 |
230 | Mark IIIA/IV/VLBA Tape Formats, Recording Modes and Compatibility *Supercedes Memo #205 + Revisions | A.R. Whitney | 20050610 |
231 | Report on “IACC Review Meeting”, 11-12 Jan 1996, Dwingeloo | A.R. Whitney | 19960119 |
232 | First Results of Mark IV Formatter Tests | D.L. Smythe, A.R. Whitney | 19960223 |
233 | Minutes of 1st International telecon on VLBI Recording held on 8 February 1996, 10:00 A.M. | H.F. Hinteregger | 19960228 |
234 | Correlator System Temperature Measurements | J. Goodman, K. Wilson | 19960306 |
235 | Poor image rejection in MkIV converters | A.E.E. Rogers | 19960329 |
236 | Thermal Testing of the Correlator Chip | Jian-Jin Tuan | 19960430 |
237 | NFRA Internal Technical Report, ITR 207, The Haystack Correlator Chip | A.Bos, W.Aldrich, A.Whitney | 19960430 |
238 | VLBA Test Memo No. 52, Mark 4 Format Test | J.D. Romney | 19960423 |
239 | Definition and Management of Correlator-Board DSP Routines | A.R. Whitney, J.I. Goodman | 19960429 |
240 | The Haystack 66×64 Crossbar Switch Haystack Mk IV | 19960604 | |
241 | Mechanics and Tribology of Recording with a Flat Top Head | Sinan Müftü | 19961008 |
242 | Junction Temperature Tests | W. Aldrich | 19961105 |
243 | Mark IV Development Group | D.L. Smythe | 19961205 |
244 | Minutes of Telecon held November 7th, 1996, 10:05-11:30 am (EST) | H.F. Hinteregger, S. Müftü | 19970109 |
245 | Mezzanine Board Interface Specification for CFA | J.I. Goodman | 19970123 |
246 | Modeling Results on the Long Term Reliability of the Flat Head Interface | S. Müftü | 19970304 |
247 | A DSP read channel for increased linear density in VLBI tape recording | J.I. Goodman | 19970321 |
248 | The Current Status of the Thin Film Head Project | H. F. Hinteregger, S. Müftü | 19970502 |
249 | Specification footnote of Cypress Semiconductor PLL Clock driver | J.I. Goodman | 19970512 |
250 | Notes on setting of rotator/vernier-delay paramaters | A.R. Whitney | 19970605 |
251 | Clarification of Mark IV data codes | A.R. Whitney | 19970605 |
252 | Spacing-Loss vs. Speed in ‘Stepped’ and ‘Triple-Cap’ Heads | H.F. Hinteregger | 19970624 |
253 | Timing recovery and gain control for proposed DSP read channel | J.I. Goodman, H.F. Hinteregger | 19970709 |
253.1 | Timing recovery and gain control for proposed DSP read channel | J.I. Goodman, H.F. Hinteregger | 19970805 |
254 | Timing on Station Unit | W.A. Aldrich | 19970721 |
255 | SMA Correlator DSP Software | A.R. Whitney | 19971104 |
255.1 | SMA Correlator DSP Software | A.R. Whitney, J.I. Goodman | 19980701 |
256 | Initial results decoding data from tape recorded at 84Kfci | J.I. Goodman | 19980115 |
257.1 | Serial Link Cables | D.L. Smythe | 19990504 |
258 | Haystack Dry Air Kit | H.F. Hinteregger, D.W. Fields, A.E. Niell | 19980606 |
259 | Mechanical test and acceptance requirements for thin tape | H.F. Hinteregger | 19980728 |
260 | Critical Screw Protrusion Check for Headstack Mounting | H.F. Hinteregger | 19981116 |
261 | Determination of Correct Write Voltage Vc:Introduction | H.F. Hinteregger | 19981116 |
262 | Spin Physics Heads at 18 Mb/s | D.L. Smythe | 19981118 |
263 | Wear Tests of the Flat-Top Thin-Film Head by Tape Shuttling | S. Muftu | 19981222 |
264 | Evaluation of Two Triple-Cap Headstack Variants | H.F. Hinteregger | 19981117 |
265 | An Introduction to the Mark IV Data Acquisition System for Mark III Users | D.L. Smythe | 19981230 |
266 | Mark IV DAS Performance Check List | D.L. Smythe | 19981228 |
267 | Tape recorder performance test | Alan E.E. Rogers, D.L. Smythe | 19981228 |
268 | Progress report on thin-film head development | H.F. Hinteregger | 19990113 |
269 | Evaluation of Phase-2, Part-1 Heads for the thin-Film MR Head Project:Triple-Flat Assembly Contour Geometry Qualification Tests | H.F. Hinteregger, S. Muftu | 19990205 |
270 | Simulation of the Tape-Flat-Head Interface for Phase II, Part 1 of the TF-Project | S. Muftu, H.F.Hinteregger | 19990203 |
271 | Test of Flat, Thin Film, Magnetoresistive Head Arrays for VLBI Tape Recorders | S. Muftu, H.F.Hinteregger | 19990412 |
272 | Tape Drive Manual for Operation in Field and Processor Sites | D.Fields, H.F. Hinteregger | 19990512 |
273 | Stepped Head Stacks at 18 Mb/s/track | D.L. Smythe | 19990616 |
274 | Evaluation of Phase-2: Five Supplementary Tests | H.F. Hinteregger | 19990908 |
275 | Bulk Degausser Evaluations and Recommendations for VLBI | H.F. Hinteregger | 19990831 |
276 | Deformation of a Tape Subject to Uniform Pressure: No-Contact Case for VLBI | S. Muftu | 19991130 |
277 | Reading and Writing at 320 IPS with Current Head Stacks | D.L. Smythe | 20000208 |
278 | Specification for Mark IV Decoder Module | A.R. Whitney, R.J. Cappallo | 20000404 |
279 | Mark IV Decoder Protocol | R.J. Cappallo | 20041118 |
280 | Wear testing of an experimental Metrum headstack | S. Muftu, H.F.Hinteregger, P.A. Bolis | 20000711 |
281 | Concept for Next Generation VLBI | J. Ritakari, H.F.Hinteregger, P.A. Bolis | 20001031 |
282 | 8 Mb/s Equalizers | D.L. Smythe | 20010214 |
283 | Mark IV Correlator Board Timing | W. Aldrich | 20010316 |
284 | 280 ips Read-Only Interface, New and Existing Head Usage Recommendations | H.F. Hinteregger | 20010710 |
285 | Review of Feb-Aug ’00 Notes: High-speed Head and Interface Problems and Fixes | H.F. Hinteregger | 20010710 |
286 | Write and Write-Crosstalk Tests of 1/2-inductance Spin-Physics Prototype and Standard Metrum Heads | H.F. Hinteregger | 20011010 |
288 | Proposed revision of headstack specifications | H.F. Hinteregger, A.E. Niell, A.R. Whitney | 20010712 |
290 | Evaluation of Capstan Noise for Model 96 Tape Transport | T. Buretta | 20010806 |
291 | Recently Discovered Model Problems in the Mark 4 Correlator | R. Cappallo | 20030313 |
292 | Optimally Setting the kdiv Parameter in the Mark 4 Correlator | R. Cappallo | 20030311 |
293 | Timing Offset of the Mark 4 Formatter | D.L. Smythe | 20061010 |